Having had a heat pump fitted the resultant tank and pipe work now needed boxing in with a useful shelf unit and a ply flush door serving as access to the tank and pipework behind.
Having had a heat pump fitted the resultant tank and pipe work now needed boxing in with a useful shelf unit and a ply flush door serving as access to the tank and pipework behind.
A load bearing bracket rotted out and an exact replacement copy made ready to be installed. I am able to copy all profiles and joinery that needs replacing , this particular piece was made using Accoya.
Sapele Handrail and Spindles fitted to a handmade open tread staircase using an adjustable handrail shoe. The fitted components were then varnished in a clear gloss varnish. before refit after refit
Herbert Collins 1885-1975 was a British architect.He designed many suburban developments in Southampton primarily but not exclusively around the Highfield and Basset Green area of Southampton.Distinctive in their design and built during the 1920s and 1930s. Today their uniqueness is…
This shows a completed shelving unit which was built into a chimney breast in aVictorian terraced property. The object was to create a copy from a original thatwas taken out by a previous owner, using an old photo.
The restoration of the interior of this boat, a 40ft Edwardian Gentleman’s Motor Yacht, to give it its correct description, was undertaken back in the early 1990s using reclaimed pitch pine sourced from the old Southampton dock. It was finished over a…